Skip to contentOpen grants and contracts
- US 422 County Line West PM
- Community Development Block Grant (CDBG)
- SBIR DON27BZ01-NV003 (Navy): Improved Cargo Door Actuator
- FSP Light Duty Tow Service - General Purpose Lanes and ExpressLanes
- ARCHITECTURAL & ENGINEERING RELATED CONSULTANT SERVICES FOR THE PITKIN COMMUNITY CENTER & SENIOR CENTER ADDITION
- World Language Textbook and Resource Adoption: Spanish
- Wetland Restoration Assistance
- Archaeometry (AMTRY)
- City of Frostburg Well Pump Station Design
- Contract Hearing Officer
- QuickBase Support Staffing
- Submarine Cable
- Improvements to Roddy Road and Expansion to the Amite River Boat Launch Dock in Port Vincent
- DEPARTMENT OF BAHAVIORAL HEALTH SERVICES BIOPSYCHOSOCIAL REHABILITATION (BPSR) WELLNESS RECOVERY CENTERS
- Nursing Lab Remodel - Room A161
- Development of Policy Framework Options for Clean Hydrogen Demand Aggregation in Washington State and the Pacific Northwest
- Parking Lot E8 Repairs
- Case Management Services
- Fire Alarm System Replacement
- CCR PHASE 3A - FRONTANG ROADS AND UTILITIES
- STATE LET CONSTRUCTION CONTRACT, BEXAR CO, CONSTRUCT PEDESTRIAN INFRASTRUCTURE
- 48--VALVE,LINEAR,DIRECTION
- Pre-Stressed Spun Concrete Poles- 12 Month Supply
- CHP Santa Cruz Area Office Protective Clothing and Operational Supply Rental Services
- Well 5 Upgrade 2026
- 2027 Public Works Culverts
- Sam Dale Lake State Fish & Wildlife Area Farm Lease 27AL2212
- Rail Industrial Access Program
- Cage and Bottle Washer
- Mortuary Services
- NEW K-8 SCHOOL/KNOX COUNTY SCHOOLS
- Hampton Twp - Sludge Hauling
- Northwest Middle School Geothermal & HVAC
- Choral Risers
- PWC Mosquito Pavilion Nature Center
- Metrology Grade Oscilloscope
- Tractor Truck
- Plainsboro Township RFP for 2027 Professionals #26-06
- Masonry Repairs
- Naming Rights Sponsorship - The Peak
- Bulk Fuel Supply & Delivery
- Yellow School Bus Transportation Service for the 2027-2028, 2028-2029, 2029-2030, 2030-2031, 2031-2032 school years
- Pour in Place Playground Surface Repairs and Replacement
- Long Lake Management District
- Ware County TIA PI# 0020592- Thigpen Road Street and Drainage Improvements
- East Palm Canyon Signal Project
- The resurfacing on S.R. 74 from near S.R. 60 (L.M. 15.55) to U.S. 11E (S.R. 2) (L.M. 17.06).
- Federal Agency Engagement and Lobbying Services
- CPD Moran Park Fieldhouse Construction - Fire Extinguishers & Cabinets
- 27-0092 - Annual Requirements Contract for Fire Hydrants
- On-Line Tax Library Services
- Acoustic Optical Borehole Televiewer
- Overlay approximately 6.6 miles of US 11 from the north abutment of the Leaf River Bridge to the Jones County Line
- Fuels Management Services at Malmstrom Air Force Base, MT and FE Warren Air Force Base, WY
- KCI PUMP STATION IMPROVEMENTS PHASE 1- DESIGN BUILD
- South Fork Crow River Sediment Forebay
- Proposition 1
- SEWER GRINDER SYSTEM
- INTERCHANGE C/R/S: WYA-US 23-03.47
- OTAG Water Heater Replacement
- Duarte Park Redevelopment: Phase II
- UCLA Telecomm Structured Cabling JOC - Medical & Off-Campus 2026
- Progressive Design Build - Brush Creek Pump Station Improvements Project (MTM1-C080)
- Comprehensive Development Impact Fee, User Fee and Nexus Study Update
- Sloan Foundation: Technology & Digital Information
- Fire Protection Sprinkler System
- Design-Build Services for Renovations at Burke County HS and Waynesboro Primary School
- Independent Operational, Staffing and Organizational Assessment for the El Paso County Sheriff's Office Department
- LOADING DOCK CONCRETE REPAIRS
- CPD - Moran Park Fieldhouse Construction - Playground Equipment
- Independence Displays Fireworks and Drone Light Show Options
- Marketing and Daily Events Calendar Software
- Bathymetric & Subsurface Survey on the Cos Cob Alternatives Analysis
- Supplemental Contracted Pavement Repair Crews
- 27-016 - Roadway Asset Inventory and Pavement Condition Assessment Services
- Well 1 Service
- Paving, cold plane AC pavement, drainage, and delineation
- Four Mile State Line Road Bridge Project
- Annual CUPCCAA Qualified Contractor List
- Meydenbauer Bay Park Phase 2 - GC/CM Services
- Port Orchard Marina Breakwater Replacement, Re-Bid
- Northgate Village Rehabilitation Re-Bid
- Replacement of Gym Floor at Elizabeth Shelton School
- Toepperwein Rd. Improvements
- Custodial Services
- Hardware, Microsoft Surface & Accessories
- Window Replacements (Mt. Dora)
- Request for Information/Market Intelligence Notice: Repair Electrical Distribution System Switchgear Stations & Addition of Redundancy Cable Use of Progressive Design Build (PDB) with Other Transaction
- New Grant Opportunity: Mojave Desert Tortoise Recovery
- Second Stage Final Clarifier Repairs Contract No. 2026-02
- Procurement and Delivery of Various Railroad Switch Ties
- Willard Bay State Park Concession Operations
- MASONIC DRIVE: TEXAS AVE - LEE ST
- Paving Services - MSA
- Fire Hydrants
- 63--BELL,ELECTRICAL
- Prequalified Electrical Stage II - Administrative Office of the Courts - Logan Courts Fire Alarm Replacement - Project #27059150
- Oaklawn Drive and Ory Road Sewer Lift Station Upgrade
- Renovate Building 1203-DOAS/AHU and Fire Suppression Water System, March Air Reserve Base, California
- Maryland Commuter Tax Credit