IFB/CON/DOA 2603-1260150 Runway 9L-27R Reconstruction
Atlanta, City Of
Who can apply
All airfield infrastructure within the defined project limits will be removed and replaced as required, including underdrain systems, airfield lighting, and pavement shoulders reconstructed to meet required cross-sections.
About this opportunity
The scope of work includes full-depth replacement of approximately 160,000 square yards of concrete pavement on Runway 9L-27R and adjacent Taxiways M2, T, M6, M12, S, M16, and M20. Work also includes demolition and full removal of Taxiways M4 and M18 with associated infield grading. All airfield infrastructure within the defined project limits will be removed and replaced as required, including underdrain systems, airfield lighting, and pavement shoulders reconstructed to meet required cross-sections. All disturbed areas will be restored to proper grade and stabilized with grass in accordance with erosion control requirements to maintain safe airfield operations.