Wwtp Sbr 1 Digester Rehabilitation
Department of Military and Veterans Affairs
About this opportunity
This Project Does Not Require You ... This Project Does Not Require You To Stop At The Visitors Center To Gain Access The Waste Water Treatment Plant Is Located Outside The Gates This Project Is A Standard Low Bid Project And Includes General Construction The Work Under This Contract Shall Generally Consist Of But Is Not Limited To Providing All Labor Material Devices Tools And Equipment Required For The Replacement Of Existing Treatment Equipment And Application Of Protective Coating System To Concrete Surfaces In Sbr 1 And Digester 1 At The Fort Indiantown Gap Wastewater Treatment Plant All Work Shall Be In Accordance With The Specifications And Drawings And Subject To The Terms And Conditions Of All Other Contract Documents Estimated Range General Construction 2 000 001 00 3 000 000 00 ...