OpenDue April 28, 2026
2026 Bridge & Box Culver Erosion Control
Thomasville, City Of
About this opportunity
� This project is based on a deficiency report that�s provided by GDOT to the City every two years. The project will provide erosion stabilizations and streambank protections on the City�s Box Culverts and Bridges. This includes work on the box culverts on Cairo Road, South Pinetree Boulevard, Clay Street, MLK at Felix Street, Edgewood Drive, and Cassidy Road. Additionally, erosion control will be provided on the MLK and Chatham Road Bridges. This work includes the installation of rock check dams, type 3 object markers, and rip rap in the ditches and in the streams.
Finding similar opportunities...