Skip to content
OpenDue May 6, 2026

West Main/Elliots Crossing Water, Sewer, Storm Drainage and Street Improvements

Thomaston, City Of

Who can apply

Installation of 3,572 LF of 8� gravity main through open cut and trenchless applications, the installation of 16 manholes, the installation of 90 new cleanouts, and all other equipment, labor, materials, and testing to complete the work as required in the plans and specifications.

About this opportunity

Installation of 3,700 LF of 8� CL350 DIP Water Main, 90 meters, new service lines by open cut and trenchless applications, new hydrants, gate valves and additional fittings, testing. Installation of 3,572 LF of 8� gravity main through open cut and trenchless applications, the installation of 16 manholes, the installation of 90 new cleanouts, and all other equipment, labor, materials, and testing to complete the work as required in the plans and specifications. This work will include the installation of a stormwater pond with accompanying outlet control structure and headwalls, 337 LF of 42� RCP, 709 LF of 36� RCP, 687 LF of 30� RCP, 354 LF of 24� RCP, and 321 LF of 18� RCP through open cut applications, the installation of various catch basins and junction boxes that remain in the ROW, and...

Finding similar opportunities...