Smoky Circle Fire Center HVAC Replacement
AGRICULTURE, DEPARTMENT OF
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
The Contractor shall furnish all supervision, materials, equipment, vehicles, tools, parts, labor, transportation, and miscellaneous items needed to remove, dispose, and replace the existing HVAC units and associated ducting work. The contractor shall reinstall any damaged HVAC ducting, Ceiling drywall, texture, moisture barrier and insulation that may be required. All work shall be in accordance with the plans and specifications contained herein. No changes to the specifications, terms, or conditions shall be made without the prior approval of the Contracting Officer in writing. All submittals for changes or substitutions will be subject to a maximum review time of 10 business days and notice of acceptance or rejection will be sent to the contractor by the CO or COR. The contractor is res...