Helena-Lewis and Clark National Forest Gipsy Lake Day Use Improvements
AGRICULTURE, DEPARTMENT OF
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
Amendment 01 Extend the "Responses Due Date" from 03/06/2026 by noon MST to 03/13/2026 by noon MST. Description: This project consists of constructing new parking and living areas at the Gipsy Lake Day Use site on the Townsend Ranger District. Construction of each new site will require excavation and grading work that will balance cut and fill for a natural fit into the landscape. Each site will include all new furnishings as shown in the drawings. BASE BID � SITE 1 Construct a double wide parking area with two living areas. Remove 4 large trees. Lop and scatter as shown on drawings for erosion control. OPTION 01 � SITE 2 Construct a single wide parking area with one living area. Install 2 new culverts. Construct a new ditch. OPTION 02 � SITE 3 Construct a single wide parking area with one...