Ramp alterations PH II
DEPT OF DEFENSE
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
Objectives: Demo and remove buildings 115, 131, 133, tent structure 321, abandoned electrical components, guardrail, fencing, and concrete and asphalt areas as shown on the demolition plan. Purchase and install storm water control structures as shown in the drawings to include catch basins, piping, and trench drains to provide a proper flow channel and remove water from the areas allowing the grounds to be maintained. Purchase and install the required electrical conduit and wiring to support new fabric shelters. Prepare areas for placement of a new concrete access road, concrete tent pad, and concrete approach around building 137 and an asphalt shoulder patch as shown on the pavements plan. Purchase and install two new tensioned fabric shelters with liners, electrical equipment, interior l...