Skip to content
OpenDue March 27, 2026

Well 4 PFAS/PFOA Repair

DEPT OF DEFENSE

Who can apply

Total Small Business Set-Aside (FAR 19.5). SBA

About this opportunity

This is a source sought for a construction requirement to install an Ion Exchange (IX) Resin System and upgrades to the Base Well #4 located at Shaw Air Force Base (AFB), South Carolina. The Contractor shall be responsible for planning, designing, constructing, and managing all activities necessary to achieve the objectives of the Statement of Work (SOW). The Government will not direct or control the Contractor?s construction means and methods but will evaluate performance based on compliance with the objectives and acceptance criteria defined herein. The purpose of the SOW is to define the requirements, performance outcomes, and constraints for the construction effort while allowing Offerors the flexibility to propose effective and innovative design and construction solutions. The Contrac...

Finding similar opportunities...