Well 4 PFAS/PFOA Repair
DEPT OF DEFENSE
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
This requirement is for a construction contract to install a Ion Exchange (IX) Resin System and upgrades to the Base Well #4 located at Shaw Air Force Base (AFB), South Carolina. The Contractor shall be responsible for planning, designing, constructing, and managing all activities necessary to achieve the objectives of this Statement of Work (SOW). The Government will not direct or control the Contractor?s construction means and methods but will evaluate performance based on compliance with the objectives and acceptance criteria defined herein. The purpose of the SOW is to define the requirements, performance outcomes, and constraints for the construction effort while allowing Offerors the flexibility to propose effective and innovative design and construction solutions. The Contractor sha...