Synopsis for Overhaul of CH-47 Control Assembly, Quadrant
DEPT OF DEFENSE
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
This is a 100% Small Business Set-Aside. The Contractor shall furnish all services, facilities, labor, parts, materials, equipment, tools and data (other than Government Furnished Property), necessary to accomplish the inspection and overhaul of the following assets: NOMENCLATURE: CH-47 Control Assembly, Quadrant INPUT/OUTPUT NSN: 1680-01-549-4959 INPUT/OUTPUT P/N: 145ES010-8 ESTIMATED QUANTITY RANGE: Minimum 9 each � Maximum 54 each (Maximum includes a Foreign Military Sales (FMS) Quantity of 9 each) This requirement is to fulfill the government�s need for the overhaul of the Control Assembly, Quadrant, NSN 1680-01-549-4959. The proposed contractual action is a five (5) year, Firm-Fixed-Price (FFP) Indefinite Delivery Indefinite Quantity (IDIQ) overhaul contract. The Control Assembly, Qua...