Immersion Tank Replacement at FRCE
DEPT OF DEFENSE
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
***QUESTIONS & ANSWERS*** 1. Lifting System / Parts Handling Intent QUESTION: SOW Section 3.3.2 references a platform that will raise and lower utilizing a hydraulic system with minimum 3-inch linear shafts and bearings mounted to the machine base. Please confirm whether the Government intends the replacement system to include: an integrated vertical lifting platform as part of the immersion tank system; or a separate external lifting/handling arrangement. ANSWER: An integrated platform. If the 4,000-lb parts are expected to be loaded using existing shop equipment, please advise whether any specific loading interface, clearance, or protection features should be incorporated into the replacement design. 2. Lift System Power Basis and Intended Use of Compressed Air QUESTION: Please clarify h...