Z1DA--NRM CONSTRUCTION -528A8-18-801 Renovate for Cardiac Cath & IR
VETERANS AFFAIRS, DEPARTMENT OF
About this opportunity
This amendment answers the following vendor questions: For this project would the government accept wall protection from Construction Specialties? Response: Yes, it is listed as InPro.� I came across a note on drawing GI 004 that calls for us to reference drawing 1-HA-103. Could not find the drawing either. Response: Amendment note for GI-004 Phase 3.5 note #8. Note #8 references 1-HA-103. It should reference drawing 1-AS-201 at coordinates 7A, and detail 5/PL-701. Electrical Site Drawing 1-ES-002 Detail 1 states that existing utilities will be marked out by this Contractor . Are As-builts available that show existing Utilities in the area? � � Response: Existing as-builts are not available. Per note at coordinates C1, the contractor is required to hand dig, field verify, and provide mark ...