Q1: Did not see anywhere in the scope of what the existing system (Head-end/Software/Hardware) is and if it is the responsibility of the security contractor to program this door? � A1: Overall control system for the doors is the Medeco XT system.� VA locksmith will program. Q2: Typically, when adding a door, you must tie the door into an access control board/panel, it does not list if they have room on an existing controller of if a new one would need to be provided. A2: Unsure about controller.� Contractor should assume they will be responsible for providing if required.