Buckley-FA2543-GasValveReplacement
DEPT OF DEFENSE
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
*** The purpose of the sources sought is to help determine technical capability and a price estimate, FOR MARKET RESEARCH ONLY *** Reference pictures not in the below text are included in the attachment to this sources sought. 1.0 Scope of Work 1.1 Primary Objective The contractor shall provide fully qualified technicians to replace seven (7) gas control valves suspected of damage from a faulty gas regulator. 1.2 Inspections and Re-commissioning Following valve replacement, the contractor shall: - Conduct comprehensive leak checks on all affected equipment. - Perform a full safety inspection of all gas-fired equipment, including internal components such as burners, heat exchangers, and all electrical/mechanical parts. - Perform multiple leak checks on each piece of equipment, both while th...