Skip to content
OpenDue April 30, 2026

Combined Project-Billings Cellblock refresh, Bozeman Wall addition, Bozeman Freezer HVAC

GENERAL SERVICES ADMINISTRATION

Who can apply

Total Small Business Set-Aside (FAR 19.5). SBA

About this opportunity

Billings USMS - Cellblock Refresh Stainless Steel Restoration: Remove scratches from stainless steel benches and walls in: Contractor/USMS/GSA walk-through required to verify exact damage locations Painting Bozeman FSA - Office Build-Out Build new wall with metal studs Install door and frame to match existing (type, size, color) Extend wall to deck above Install matching baseboard on new wall Add electrical receptacles if required by code Repair/replace carpet as needed Paint entire room with low VOC paint to match existingRepair affected ceiling grid Relocate fire sprinklers per code Move HVAC ceiling penetrations as needed Bozeman FWS - Freezer HVAC Install heat removal system for ultra-low temperature freezers Maintain room temperature between 64.4�F to 89.6�F per equipment specificatio...

Finding similar opportunities...