Skip to content
OpenDue April 6, 2026

6680--Loch Raven Boiler Fuel Reserve Tank

VETERANS AFFAIRS, DEPARTMENT OF

Who can apply

Total Small Business Set-Aside (FAR 19.5). SBA

About this opportunity

AMENDMENT TO SOLICITATION 36C24526Q0377 This amendment is to answer the following questions: What is the distance from the new tank location to the Boiler Room? This distance is approximately 40 feet. Picture attached. Is there an existing electrical source near the proposed tank location suitable for powering pumps, leak detection, or monitoring equipment? Yes, the shop recommends G-17 and running a cord to an outlet or tying into one of the panels inside. This will be determined in the field. Does the facility currently hold an oil storage or oil burning operating permit? Yes, the facility does hold an oil storage permit. Please confirm the model number of the existing Veeder Root monitoring system so we can verify compatibility with the new tank installation. Model: TLS-450 Plus The sol...

Finding similar opportunities...