Replace Chiller York 2075

DEPT OF DEFENSE

Who can apply

Total Small Business Set-Aside (FAR 19.5). SBA

About this opportunity

The contractor shall provide supervision, labor, material and equipment required to perform all work for the following project: Replace Chiller York 2075. The work includes the decommissioning of the existing 100-ton chiller, its relocation to a new site approximately two (2) miles away near the chiller unit at York 1595, and the complete supply, installation, and commissioning of a new high-efficiency 100-ton air-cooled scroll packaged chiller at the original location. Replace all insulation, heat tape, aluminum jacketing, pressure and temperature gauges on water lines above existing concrete pad. The contractor is responsible for providing all labor, materials, tools, equipment, and supervision required to execute this project safely and in compliance with all applicable codes and standa...