Skip to content
OpenDue April 24, 2026

Congressional Cable TV System Assessment

ARCHITECT OF THE CAPITOL

Who can apply

No Set aside used. NONE

About this opportunity

The Architect of the Capitol (AOC) has a requirement for a contract for Capitol Power Plant, with a period of performance of 180 Calendar Days. 1.1 CONGRESSIONAL Cable TV systems assessment BACKGROUND During the late 70�s, the first proposed 13 channel system was requested by both Senate Rules and House Administration. Starting with a single rack in the attic of the Russell Senate Office building, then in the early 80�s, say 1981 a new design for the system was implemented, with a joint cable system located in the Russell Senate Office Building subway platform to the Capitol completed in 1983. Then in the time period of 1986 through 1987 the migration of a new Senate headend was built to support a complete switcher to control all aspects of both systems with the current system at 59 Analog...

Finding similar opportunities...