Camp Robinson Fuel Facilities Repairs
DEPT OF DEFENSE
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
All work required to repair Bulk fencing, fence grounding, Lightning Protection System, and canopy roof drain system. Install Basket Strainer, Install Flow Switch, Install Pressure Gauges, Install Sight Flow Indicator, Replace Loading Arm Swivel Joints, Install Offload Meter and Meter Proving Connections, Install Truck Loading Control Valve, Install Thermal Relief Valves, and Replace Threaded Piping and Fittings, Install Issue Meter Basket Strainer, and repair improper flexible conduit and Missing Sealing Fitting. Install Basket Strainer, Install Flow Switch, Install Pressure Gauges, Install Sight Flow Indicator, Replace Loading Arm Swivel Joints, Install Offload Meter and Meter Proving Connections, Install Truck Loading Control Valve, Install Thermal Relief Valves, Repair Filter Separator...