Repair LRS Hazmat Roof, B155
DEPT OF DEFENSE
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
The Contractor must provide all plant, labor, equipment, transportation, and tools required to perform the entire design and replacement of the roof of building 155, replace the overhang covering the exhaust louver on the rear of the facility, and the overhang covering the entrance and roll up door on the front of the facility. The new roof and overhands shall eliminate each and every weather borne water leak into B155. The new roof shall be free from ponding. The new roof shall be insulated meeting ASHRAE zoning requirements for the facility. The new roof shall be a TPO single ply membrane roofing system. The work shall include but is not limited to: replacement of built up roof components down to roof decking, insulation, gutter system including downspouts, roof curbing, and roof coping....