WATER TOWER REFURBISHMENT
INTERIOR, DEPARTMENT OF THE
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
The USGS Wetland and Aquatic Research Cent located in Gainesville, FL has a requirement to refurbish a 10,000-gallon elevated water tank. It includes the following: - Repainting Exterior: Pressure washing, surface prep (Surface Preparation Standards #2 & #3 Hand or power tool cleaning removes loose rust, paint, and mill scale), primer and polyurethane finish. - Repainting Interior: Tank draining (by others), abrasive blasting to (Surface Preparation Standards #10 Near-White Metal), epoxy prime/finish coats, weld/ladders stripe coat, debris disposal. - Ladder Repair: Remove old ladder, install new 10-ft steel ladder with welded standoff brackets, paint per interior spec. - Work will take place in the following county in Florida: Alachua - Period of Performance is 30 days after notice to pro...