Building 16 Fire Project
DEPT OF DEFENSE
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
The contractor shall provide the necessary, personnel, equipment, transportation, and materials required to make necessary repairs needed to fix fire deficiencies on second floor of Building 16. This is to include replacement of 3 interior second floor windows, 1 single metal door, frame, and hardware. Replace hardware on 3 existing doors. Repair existing drywall as needed and application of intumescent fire-resistant paint. All work performed under this Statement of Work shall be conducted in accordance with all applicable state and federal laws and regulations, ANG policies and regulations, and this SOW as outlined below. The contract duration will be 180 calendar days after notice to proceed to include inspection and punch list. This project is set aside 100% for small business. The Nor...