Skip to content
OpenDue May 26, 2026

Bldg 30 Project

DEPT OF DEFENSE

Who can apply

Total Small Business Set-Aside (FAR 19.5). SBA

About this opportunity

The project is to renovate the existing locker rooms and additional office space within building 30. The scope includes, but is not limited to, demolish of existing select walls, stick down tile, carpet, locker curbs, drop ceilings, electrical, plumbing, along with relocation of existing doors. The locker rooms will require the addition of plumbing, electrical, walls, ceiling, base trim, and epoxy flooring. The project will include but not limited to additional work outside of locker rooms, demo of existing flooring, new epoxy flooring, new break room kitchen cabinets and countertops, wall repair and paint, base trim, lighting replacement, replacement of door hardware, and floor drain repair in active laboratory. All work performed under this Statement of Work shall be conducted in accorda...

Finding similar opportunities...