Skip to content
Funding Landscape

Ruthville Wastewater Plant Replacement

The Project generally consists of replacing the existing wastewater treatment plant (WWTP) serving the Ruthville Service Area of Charles City County and associated upgrades to the collection system.

Status
Open
Due
Dec 17, 202630 days left
Amount
Not stated
Eligibility
Not stated
Issuer
Charles City County
Notice number
131824
Email me listings like thisClose email options

Description

Read the full description

The work includes the installation of two low-pressure grinder pump stations with associated piping, equipment, and a 2-inch force main conveying flow to a buried 10,000-gallon Flow Equalization Tank. Treatment facilities include an Owner-Furnished Fluidyne Integrated Surge Anoxic Mix (ISAM) treatment system installed on a cast-in-place concrete pad, an elevated walkway surrounding the treatment tank, and a chlorine contact tank with chlorination and dechlorination tablet feed systems. A 10-foot by 14-foot prefabricated building shall be provided to house electrical and control panels and the alkalinity chemical feed system. The Contractor shall review the construction sequencing requirements shown on the Contract Drawings prior to bid submission, as the proposed treatment facilities are located adjacent to the existing plant. The existing wastewater treatment plant shall remain in operation throughout construction. Following successful startup, testing, and Owner acceptance of the new facilities, the Contractor shall demolish and abandon designated portions of the existing wastewater treatment plant as indicated in the Contract Documents.

See more open Virginia contract opportunities like this

Get new bids for the work you do

Choose your keywords and state, then confirm a weekly email alert.

Choose my bid alert