Skip to content
Funding Landscape

V250 AND TMS KIT

Record: https://fundinglandscape.com/opportunity/cmjv2o1oq00kqjl048hrdxhes · Official notice: https://sam.gov/opp/1382ddf28b4043f693446ab0ceba574b/view

Open. Deadline Dec 1, 2026. Notice W58RGZ-25-Q-0016. (current status: https://fundinglandscape.com/opportunity/cmjv2o1oq00kqjl048hrdxhes)

Deadline: Dec 1, 2026. Add to calendar: https://fundinglandscape.com/opportunity/cmjv2o1oq00kqjl048hrdxhes/deadline.ics (Google Calendar: https://fundinglandscape.com/opportunity/cmjv2o1oq00kqjl048hrdxhes/calendar/google)

Issuer: DEPT OF DEFENSE.DEPT OF THE ARMY.AMC.ACC.ACC-CTRS.ACC RSA.W6QK ACC-RSA

Submit through the official notice: https://sam.gov/opp/1382ddf28b4043f693446ab0ceba574b/view

Funding Landscape's record of a notice published on SAM.gov.

The Prototype Integration Facility (PIF), Combat Capabilities Development Command (DEVCOM) Aviation and Missile Center, Redstone Arsenal, Alabama, has a requirement to procure a Torque Measurement System to interoperate with a Variable-Geometry, Radial Outflow Compressor (VAROC) Air Dynamometer 250 and T408 aircraft engine in support of Flexible Engine Diagnostics Systems (FEDS).

Status
Open
Due
Dec 1, 2026
Eligibility
No Set aside used
Issuer
Department of Defense, Department of the Army
Notice number
W58RGZ-25-Q-0016

Funding Landscape alerts

Email me listings like thisClose email options

Description

Read the full description

Description of Required Supplies/Services: Description V250 / T408 Torque Measurement System Kit The contractor shall provide the following with the TMS Kits: TMS Module / Shaft to engine components: spline adapter and splined hub, if necessary. TMS Plumbing TMS Calibration Kit with weights Electronics: Signal processor, Rotastat Control and 90 ft. cable V250 Application Study for the T408 Aircraft Engine The contractor shall evaluate the V250 Dynamometer with respect to testing objectives and configuration needs for testing the GE T408 Turboshaft Engine. The contractor shall define the specific interphase requirements with consideration to test plans, including inertia requirements, speeds, and power. The following are deliverables as a result of this application study: Special Rotor consideration for inertia requirements Identifying the torque measurement equipment, including but not limited to torque meter, interconnect shafts, and electronics. Upon determining appropriate torque meter system, CN will update or generate new drawings and documents and enable life solutions.

About Funding Landscape

Open grants and government contracts.

Example · Web page · Plain text · Email alerts

Search open grants and contracts on Funding Landscape

See more open contract opportunities like this

Funding Landscape alerts

Get new bids for the work you do

Choose your keywords and state, then confirm a weekly email alert.

Choose my bid alert