Skip to content
Funding Landscape

ND OMAD 2025(1) Minuteman Missile Access Road

Record: https://fundinglandscape.com/opportunity/cmvrpnkxz0037l5082jz8ttml · Official notice: https://sam.gov/workspace/contract/opp/da5226c0a471460db06a23fbb15b9baa/view

Open. Deadline Dec 2, 2026 at 1:00 PM UTC-7. Notice 6982AF27B000011. (current status: https://fundinglandscape.com/opportunity/cmvrpnkxz0037l5082jz8ttml)

Deadline: Dec 2, 2026 at 1:00 PM UTC-7. Add to calendar: https://fundinglandscape.com/opportunity/cmvrpnkxz0037l5082jz8ttml/deadline.ics (Google Calendar: https://fundinglandscape.com/opportunity/cmvrpnkxz0037l5082jz8ttml/calendar/google)

Posted: November 13, 2026

Issuer: TRANSPORTATION, DEPARTMENT OF

Submit through the official notice: https://sam.gov/workspace/contract/opp/da5226c0a471460db06a23fbb15b9baa/view

Funding Landscape's record of a notice published on SAM.gov.

PROJECT DESCRIPTION: The Office of Missile Air Defense Program (OMAD) is a Defense Access Road (DAR) program used by the Department of Defense (DoD) to fund the annual maintenance and improvements on certified gravel roads.

Status
Open
Due
Dec 2, 2026, 1:00 PM UTC-7
Posted
November 13, 2026
Eligibility
Small businessFull requirements
Issuer
Department of Transportation
Notice number
6982AF27B000011

Funding Landscape alerts

Email me listings like thisClose email options

Description

FHWA works with the Military Surface Deployment and Distribution Command (SDDC) to support the Air Force Intercontinental Ballistic Missile Program (Minuteman). These Minuteman Missile Access Roads are located in 6 counties within North Dakota. SCOPE OF THE WORK: The work includes roadway reconditioning and adding four inches of aggregate surface course as well as the replacement of culverts. All proposed work is to stay on the existing roadway bench. The proposed typical section consists of reconditioning the existing gravel roadway per Section 303 and adding an additional 4-inches of Aggregate Surface Course with a maximum width of 24-feet. A 4% crown is proposed or as approved by the CO. The Contractor will need to taper down the proposed aggregate surface, per the typical section, at applicable locations.

Requirements

Small Business Set Aside - Total