REMEDIATION AND RESTORATION ACTIVITIES
Record: https://fundinglandscape.com/opportunity/cmwaa90sz0027lb0756f9zbdb · Official notice: https://sam.gov/workspace/contract/opp/e40df3eb69da4dd38e30de9746c534f5/view
Open. Deadline Nov 23, 2026 at 1:00 PM UTC-5. Notice 6913G627Q300003. (current status: https://fundinglandscape.com/opportunity/cmwaa90sz0027lb0756f9zbdb)
Deadline: Nov 23, 2026 at 1:00 PM UTC-5. Add to calendar: https://fundinglandscape.com/opportunity/cmwaa90sz0027lb0756f9zbdb/deadline.ics (Google Calendar: https://fundinglandscape.com/opportunity/cmwaa90sz0027lb0756f9zbdb/calendar/google)
Posted: November 10, 2026
Issuer: TRANSPORTATION, DEPARTMENT OF
Submit through the official notice: https://sam.gov/workspace/contract/opp/e40df3eb69da4dd38e30de9746c534f5/view
Funding Landscape's record of a notice published on SAM.gov.
Under an Interagency Agreement, the U.S. Department of Transportation John A. Volpe National Transportation Systems Center (Volpe Center) is providing support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program.
- Status
- Open
- Due
- Nov 23, 2026, 1:00 PM UTC-5
- Posted
- November 10, 2026
- Eligibility
- Small businessFull requirements
- Issuer
- Department of Transportation
- Notice number
- 6913G627Q300003
Funding Landscape alerts
Email me listings like thisClose email options
Email me listings like this
Department of Transportation
You'll get new contracts from Office of the Secretary.
Weekly emails when there are new matches. You may also receive an initial email. Stop any time.
Description
Read the full description
As part of this effort, a Remedial Action (RA) will be conducted at one facility in the FAA Eastern Service Area (ESA) to remove identified soil contamination. The site requiring remediation for lead- and polychlorinated biphenyl (PCB)-contaminated soils is QPI RCAG – Matawan, NJ (40.370895°,-74.220954°). The FAA’s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facility above based on prior research, known historic operations and practices, and required cleanup actions. The Contractor shall conduct all work in accordance with Federal, State, and local requirements.
Where inconsistencies exist, the Contractor shall follow the most stringent requirement. The Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below.
To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for the site.
FAA has consulted a Licensed Site Remediation Professional (LSRP), and the LSRP will select and approve all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. Confirmatory sampling has already been conducted at the site. Additionally, the work plan shall also identify any required permits needed to perform the work. Futhermore, components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed.
The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. An outline summarizing the required content of the work plan is Technical Approach (Method and procedures for soil remediation, removal, disposal a. Identification of required work permits and b. Site Safety Health Plan (SSHP). Risk Management Plan a. Identification of major risks and b.Risk mitigation plan. The contractor should expect a 5-business day Volpe Center review period between submission of the Draft Work Plan and receipt of Volpe Center comments.
The Volpe Center and the Contractor shall meet to discuss any comments and changes, if necessary. The contractor shall make the changes and submit a Final Work Plan within 5 business days of the receipt of comments. Contaminated Soil Remediation: Preliminary Assessment/Site Investigation (PA/SI) and Remedial Investigation (RI) activities completed between 2020 and 2025 found soils at the below site containing contamination above FAA’s action levels, which are based on U.S. Environmental Protection Agency (EPA) and/or New Jersey Residential Soil Remediation Standards. Examples include lead-in-soil concentrations above 200 mg/kg (ppm) or PCB-in-soil concentrations above 0.25 mg/kg.
See SOW for greater details.
Requirements
Small Business Set Aside - Total
About Funding Landscape
Open grants and government contracts.
Search open grants and contracts on Funding Landscape
Find similar listings
Similar open listings
- Remediation and Restoration ActivitiesSame funderOpenTRANSPORTATION, DEPARTMENT OFCloses Nov 23, 2026
- Fiscal Year (FY) 2027 Florida Panhandle Optimized Remediation Contract (ORC) and Military Munitions Response Program (MMRP)OpenDEPT OF DEFENSECloses Dec 18, 2026 (in 28 days)
- F--Mold remediation, Merritt Island NWROpenINTERIOR, DEPARTMENT OF THECloses Nov 24, 2026
- Architectural-Engineering Services for Hazardous, Toxic, and Radioactive Waste Services for Various Locations within the U.S. Army Corps of Engineers New England District Mission Boundaries and Other North Atlantic Division Mission BoundariesOpenDEPT OF DEFENSECloses Jan 29, 2027 (in 70 days)
- Environmental Science and Engineering Contract, A-E Services to be Ordered on Indefinite-Delivery, Indefinite-Quantity ScheduleOpenDEPT OF DEFENSECloses Nov 2027
See more open New Jersey contract opportunities like this
Funding Landscape alerts
Get new bids for the work you do
Choose your keywords and state, then confirm a weekly email alert.
Choose my bid alert