Skip to content
Funding Landscape

Electric Power Resiliency Building 56

Record: https://fundinglandscape.com/opportunity/cmwbq359q009hl0089kuxejsm · Official notice: https://sam.gov/workspace/contract/opp/ee3c354d33444f8ea8302fb2f23df40c/view

Open. Deadline Dec 9, 2026 at 1:00 PM UTC-5. Notice SP330027Q0012. (current status: https://fundinglandscape.com/opportunity/cmwbq359q009hl0089kuxejsm)

Deadline: Dec 9, 2026 at 1:00 PM UTC-5. Add to calendar: https://fundinglandscape.com/opportunity/cmwbq359q009hl0089kuxejsm/deadline.ics (Google Calendar: https://fundinglandscape.com/opportunity/cmwbq359q009hl0089kuxejsm/calendar/google)

Posted: November 10, 2026

Issuer: DEPT OF DEFENSE

Submit through the official notice: https://sam.gov/workspace/contract/opp/ee3c354d33444f8ea8302fb2f23df40c/view

Funding Landscape's record of a notice published on SAM.gov.

Contract notice from Department of Defense.

Status
Open
Due
Dec 9, 2026, 1:00 PM UTC-518 days left
Posted
November 10, 2026
Eligibility
Small businessFull requirements
Issuer
Department of Defense
Notice number
SP330027Q0012

Funding Landscape alerts

Email me listings like thisClose email options

Description

Read the full description

This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at theDefense Distribution San Joaquin California.Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaicsystem for building 56. but not limited to:The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed thelisting and qualification tests.

All design and installation shall comply with the most recent version of each document.The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor.The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required.

The PV systems shall be consistentwith and adhere to all California Building Codes and standards, the California Solar Initiative program, and any and all CEC technical and installation specifications and guidelines.There is one existing electric substation feeding building 56 with a capacity: 12470/408V, 3000KVA transformer. Switchgear is rated: 4000A bus bar and four existing 1200A frame sizecircuit breaker spaces are available.

Requirements

Small Business Set Aside - Total