Electric Power Resiliency Building 56
Record: https://fundinglandscape.com/opportunity/cmwbq359q009hl0089kuxejsm · Official notice: https://sam.gov/workspace/contract/opp/ee3c354d33444f8ea8302fb2f23df40c/view
Open. Deadline Dec 9, 2026 at 1:00 PM UTC-5. Notice SP330027Q0012. (current status: https://fundinglandscape.com/opportunity/cmwbq359q009hl0089kuxejsm)
Deadline: Dec 9, 2026 at 1:00 PM UTC-5. Add to calendar: https://fundinglandscape.com/opportunity/cmwbq359q009hl0089kuxejsm/deadline.ics (Google Calendar: https://fundinglandscape.com/opportunity/cmwbq359q009hl0089kuxejsm/calendar/google)
Posted: November 10, 2026
Issuer: DEPT OF DEFENSE
Submit through the official notice: https://sam.gov/workspace/contract/opp/ee3c354d33444f8ea8302fb2f23df40c/view
Funding Landscape's record of a notice published on SAM.gov.
Contract notice from Department of Defense.
- Status
- Open
- Due
- Dec 9, 2026, 1:00 PM UTC-518 days left
- Posted
- November 10, 2026
- Eligibility
- Small businessFull requirements
- Issuer
- Department of Defense
- Notice number
- SP330027Q0012
Funding Landscape alerts
Email me listings like thisClose email options
Email me listings like this
Department of Defense
You'll get new contracts from Defense Logistics Agency.
Weekly emails when there are new matches. You may also receive an initial email. Stop any time.
Description
Read the full description
This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with part 12 to accomplish at theDefense Distribution San Joaquin California.Contractor is to provide all labor, supervision, materials, tools, and equipment to design and modify the existing electrical system to include 500 KW AC roof mounted solar photovoltaicsystem for building 56. but not limited to:The solar photovoltaic (PV) system hardware and services shall meet or exceed all local, State and utility requirements, conform to the applicable codes and standards, and have passed thelisting and qualification tests.
All design and installation shall comply with the most recent version of each document.The final design of the on-site PV systems shall be the responsibility of the Contractor based on site conditions, roofing materials, and final system component selections by the Contractor.The systems must be compliant with applicable design guidelines. This Section identifies the minimum technical and installation specifications required.
The PV systems shall be consistentwith and adhere to all California Building Codes and standards, the California Solar Initiative program, and any and all CEC technical and installation specifications and guidelines.There is one existing electric substation feeding building 56 with a capacity: 12470/408V, 3000KVA transformer. Switchgear is rated: 4000A bus bar and four existing 1200A frame sizecircuit breaker spaces are available.
Requirements
Small Business Set Aside - Total
About Funding Landscape
Open grants and government contracts.
Search open grants and contracts on Funding Landscape
Find similar listings
Similar open listings
- H361--LEX Triannual Energy Study and ARC Flash TestingOpenVETERANS AFFAIRS, DEPARTMENT OFCloses Nov 2027
- Repair Electrical SystemsSame funderOpenDEPT OF DEFENSECloses Nov 30, 2026
- J061--Eaton Powerware System ReplacementOpenVETERANS AFFAIRS, DEPARTMENT OFCloses Nov 26, 2026
- Z2DA--666-27-102 Lightning Protection Update B71NOpenVETERANS AFFAIRS, DEPARTMENT OFCloses Nov 27, 2026
- Z1DA--Project No. 583-22-106- Replace Electrical Panels & Expand Distribution.OpenVETERANS AFFAIRS, DEPARTMENT OFCloses Dec 9, 2026 (in 18 days)
See more open contract opportunities like this
Funding Landscape alerts
Get new bids for the work you do
Choose your keywords and state, then confirm a weekly email alert.
Choose my bid alert