Skip to content
Funding Landscape

56 CS FOC to Flightline and Wx Equipment, Luke AFB

Record: https://fundinglandscape.com/opportunity/cmwend1tb0003kz077gwdikdh · Official notice: https://sam.gov/workspace/contract/opp/59536ab59e6b4a6c8c1bc48cfdb99854/view

Open. Deadline Nov 30, 2026 at 1:00 PM UTC-8. Notice F3YCFA6173AC01. (current status: https://fundinglandscape.com/opportunity/cmwend1tb0003kz077gwdikdh)

Deadline: Nov 30, 2026 at 1:00 PM UTC-8. Add to calendar: https://fundinglandscape.com/opportunity/cmwend1tb0003kz077gwdikdh/deadline.ics (Google Calendar: https://fundinglandscape.com/opportunity/cmwend1tb0003kz077gwdikdh/calendar/google)

Posted: November 9, 2026

Issuer: DEPT OF DEFENSE

Submit through the official notice: https://sam.gov/workspace/contract/opp/59536ab59e6b4a6c8c1bc48cfdb99854/view

Funding Landscape's record of a notice published on SAM.gov.

FINAL EXTENSION: Proposals are due no later than 30 November at 1300.

Status
Open
Due
Nov 30, 2026, 1:00 PM UTC-8
Posted
November 9, 2026
Eligibility
Women-owned small businessFull requirements
Issuer
Department of Defense
Notice number
F3YCFA6173AC01

Funding Landscape alerts

Email me listings like thisClose email options

Description

Read the full description

NO ADDITIONAL EXTENSIONS WILL BE PROVIDED. Responses to Site Visit Q&A will be posted by 13 November 2026 at 1300 Arizona Time. The Government intends to hold a site visit for subject requirement on 4 November 2026 at 0900 AM. Below you will find the instructions and required documents to attend. Only SBA Certified Women Owned Small-Businesses are eligible for this requirement. **THIS IS THE ONLY DATE AND TIME FOR THE SITE VISIT, REQUESTS TO MAKE ANY CHANGES WILL BE DENIED** Attendance will be limited to 2 representatives for each contractor.

To attend please provide the attached template (Site Visit Base Access_Template) completed with the below information, to rachel.tilley.1@us.af.mil, no later than 26 October 2026 at 1500 Arizona Time. Required Info: Last Name, First Name, DOB, US Citizen, License or ID#, State of Issue, Last 4 SSN To access the installation, the attendee will be required to have a REAL ID or Government Issued Passport.

When submitting the above information, please include a copy of the form of ID to allow for Security Forces to verify if it meets the requirements. **QUESTIONS ARE DUE NO LATER THAN COB 22 OCTOBER 2026 at 1500 AZ time** ***FINALIZED Q&A Document will be posted with answers no later than 26 October 2026*** This SOW defines the requirement for the Contractor to Engineer, Furnish, Install and Test (EFI&T) new 12-Strand (St), Single Mode (SM) Fiber Optic Cable (FOC) from Radar Approach Control (RAPCON, B979) to Air Traffic Control Tower (ATCT, B998), Base Operation (Ops)B453), Command Post (CP, B11), Localizer (B1375), Glide Slope (GS, B1056), Tactical Air Navigation (TACAN, B1049), Ground Antenna Transmit and Receive (GATR, B1040), Glide Slope (B1081 and Localizer (B1059).

Also, 12-St SM FOC from Base Ops (B453) to Primary and Secondary Automatic Meteorological Station (FMQ-19s). The work will be performed at Luke AFB AZ by using new and existing Manhole/Handhole Duct System. Some portion of the cable route/path will be Direct Buried. The Contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, and other incidentals necessary to meet the requirements as stated in this SOW. All equipment, supplies, or materials provided shall be new and not refurbished. No equipment, supplies, or material will be provided by the government.

All materials used in this SOW must be rust-proof and corrosion-resistant, due to the nature of the environment. See attached Solicitation and supporting documents for additional information.

Requirements

SBA Certified Women-Owned Small Business (WOSB) Program Set-Aside (FAR 19.15)