J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT
J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT, issued by VETERANS AFFAIRS, DEPARTMENT OF, responses are due November 30, 2026. Funding Landscape last saw it at the official source on November 24, 2026.
- Status
- Open. Deadline Nov 30, 2026 at 8:00 AM UTC-5. Notice 36C24527Q0061.Last confirmed with the source on November 24, 2026
- Due
- Nov 30, 2026, 8:00 AM UTC-5Add to calendarGoogle Calendar
- Posted
- November 18, 2026
- Issuer
- Department of Veterans Affairs
- Notice number
- 36C24527Q0061
Funding Landscape alerts
Email me listings like thisClose email options
Email me listings like this
Department of Veterans Affairs
You'll get new contracts from Department of Veterans Affairs matching “facilities support services”.
Weekly emails when there are new matches. You may also receive an initial email. Stop any time.
Description
Read the full description
Primary Deliverables and Project Requirements Covid Ward 2nd floor B wing Upgrade exhaust fans Air Handling Unit (AHU-B) located in attic Replace and upgrade EF-1A and EF-1B for higher CFM outputs Install heat tracing for chillers Wiring and junction box located in room G-15. Chiller located outside CLC in the pit behind the service road. Assess current heat tracing for chill water line. Complete and terminate existing heat tracing wiring to an emergency electrical panel in G-17 in coordination with the VA. Panel selection is TBD. Install a 20-amp GFPE circuit breaker for the heat tracing to the panel selected by the VA. Kitchen basement Replace cooling coil(s) AHU-E located in attic.
Replace fan motor AHU-E located in attic. AHU has one fan. New motor must be rated for and capable of sustaining a fan speed of 60Hz. Replace Variable Frequency Drive (VFD) VFD located in the attic and attached to the AHU Replace VFD in kind with Manufacturer (ABB) Controls Integration & Coordination VA has an existing contract with Johnson Controls International (JCI). The contractor shall coordinate with the COR and Facility Maintenance to satisfy necessities for the facility s existing Building Automation System (BAS) controls corresponding to all new work.
Contractor will replace/reinstall or provide new hardware or connections for BAS monitoring when required to complete BAS programming or integration. This can include control wiring, modulators, switches, routing, existing equipment etc. These requirements are determined on a case-by-case basis. Testing Adjusting & Balancing (TAB) TAB shall occur after HVAC modifications are made. It must be performed by a certified vendor/contractor per TABB and/or other ANAB accredited programs for standard industry HVAC system performance compliance Contractor shall provide notice to and request attendance of the COR and/or other COR-approved VA representation prior to TAB.
A report on the TAB results must be delivered to the COR. TAB report will be reviewed and approved by the VA prior to contractual closeout and final payment Warranty, Operations & Manuals (O&Ms) and Shop Drawings Contractor and/or subcontractor shall provide a warranty letter including point of contact, to the VA. Warranty is based on workmanship, material and equipment. Duration of warranty starts after acceptance and use of new equipment & components O&Ms for all new equipment and other components requiring preventative maintenance shall be provided to the VA.
All O&M documents must be received by the VA prior to contractual closeout and final payment Contractor shall provide training to the VA. Shop Drawings All layout changes and new equipment shall be updated in as-builts, shop drawings, manufacturer diagrams, details, where applicable. Due to the nature of the contract, this requirement will be determined based on off application by the COR at completion of work. If no applicable documents are required, then the COR will opt for omission. Assumptions Contractor to provide a cost/unit for each of the deliverable items above and use the total amounts provided for their proposal.
Contractor to track the quantities used on their pay applications with any amounts left over being returned to the government after final payment. All deliverables must be received by the VA prior to final payment. Line items will be tracked in every pay application. Financial progress for a line item will be cross-referenced with the corresponding item s physical progress and/or completion status. Misrepresentation of a line item s financial progress may result in rejection from the COR and require the contractor to resubmit the pay application with revision(s). Pay applications must be submitted with a total amount not to exceed the Purchase Order (PO) balance.
A contract modification from the Contracting Officer (CO) is required for payment application submissions exceeding the PO balance. Additional work outside of the contract and contractual supplement documents (provided drawings, as-builts, details, existing product information, etc) require authorization and written execution from the CO. Any additional work (quantified via labor, material or equipment) performed/provided by the contractor without guidance from the VA or direction from the CO shall not be included in payment applications. The contractor is committed to working at their own expense and risk under this condition.
Supplemental contractual and scope of work include existing as-builts, details and compliance for VA guidelines, federal & state guidelines, applicable codes, etc. VA can provide the contractor with additional available drawings and other documentation. These are considered items pertaining to the original contract s scope of work Standard Inclusions & General Compliance Contractor is responsible for cleaning the work area of trash regardless of if it is their trash or not. This includes areas that other entities may have access to like the attic and mechanical spaces. Contractor is responsible for stewardship of work area and compliance with VA medical facility guidelines.
Contractor will adhere to VA-granted permitting requirements and industry standard safety practices including but not limited to: Infection Control Risk Assessment (ICRA) Pre-Construction Risk Assessment (PCRA) Hot or burn work Confined space entry work (if applicable) Lock out tag out (LOTO) procedures PPE Parking at the Loch Raven campus is limited and contractors are subject to facility guidelines for locations of contractor vehicles. Guidance for contractor parking is enforced by the COR, Facility Maintenance Supervisor, Campus Manager, and Deputy Medical Director.
Parking outside the campus boundary is not in the VA s jurisdiction The contractor shall coordinate with the facility prior to work that impacts patient care such as shutting down A/C, heating, power or other utilities. Utility and HVAC shutdowns require at least a 14-day written request to the facility per the VA s internal Standard Operating Procedure. Period of performance is 90 calendar days.
About Funding Landscape
Open grants and government contracts.
Search open grants and contracts on Funding Landscape
Find similar listings
Similar listings
- J041--TIERED EVALUATION: Preventive Maintenance and Repair Services for HVAC Water Chillers and Air Handling Units (AHU) at the VA Caribbean Healthcare System (VACHS)Same funderOpenVETERANS AFFAIRS, DEPARTMENT OFCloses Jan 12, 2027
- RFP2027-01 - HVAC City of DuluthOpenDuluth, City OfCloses Jan 27, 2027
- Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009)Same funderOpenVETERANS AFFAIRS, DEPARTMENT OFCloses Dec 17, 2026
- Y1DA--512A5-22-700 | EHRM Infra Upgrades | Perry Point, MD CO: Samantha Mihaila CS: Ric SochorSame funderOpenVETERANS AFFAIRS, DEPARTMENT OFCloses Jan 6, 2027
- Z2DA--FY27 EHRM | 657-21-702JC EHRM Training And Administrative Space Construction - St Louis John CochranSame funderOpenVETERANS AFFAIRS, DEPARTMENT OFCloses Dec 9, 2026
See more open contract opportunities like this
Funding Landscape alerts
Get new bids for the work you do
Choose your keywords and state, then confirm a weekly email alert.
Choose my bid alertAbout this record
Compiled by Funding Landscape from 1 official source, checked on November 24, 2026.
This listing comes from 1 official source, sam.gov.
Funding Landscape rebuilds its lists from official sources.
Record: https://fundinglandscape.com/opportunity/cmwub9jrb004il20850vjywrp · Official notice: https://sam.gov/opp/0db5662de5914b458655bed9898980cf/view
Open. Deadline Nov 30, 2026 at 8:00 AM UTC-5. Notice 36C24527Q0061. (current status: https://fundinglandscape.com/opportunity/cmwub9jrb004il20850vjywrp)
As of November 28, 2026, Funding Landscape lists 50 other open HVAC contracts nationwide: https://fundinglandscape.com/contracts/hvac?source=listing
Email alerts for listings like this: https://fundinglandscape.com/save?q=hvac&kind=contract&source=listing
Deadline: Nov 30, 2026 at 8:00 AM UTC-5. Add to calendar: https://fundinglandscape.com/opportunity/cmwub9jrb004il20850vjywrp/deadline.ics (Google Calendar: https://fundinglandscape.com/opportunity/cmwub9jrb004il20850vjywrp/calendar/google)
Posted: November 18, 2026
Issuer: VETERANS AFFAIRS, DEPARTMENT OF
Summary. VETERANS AFFAIRS, DEPARTMENT OF lists J065--KG - HVAC upgrades (VA-27-00018970 / 36C245-27-AP-1028 / 512-27-1-444-0007 ) EDA: 12/11/2026 ; STATUS: Moved to Keysha Gorman for action on 11/6/2026 (DGM) ; NEED DATE 11-20-26 (unrealistic per PALT) MOVED TO BC FOR ASSIGNMENT. Listed location is USA. The published deadline is Nov 30, 2026 at 8:00 AM UTC-5. The notice number is 36C24527Q0061. The source reference is 0db5662de5914b458655bed9898980cf. NAICS 561210.
Place. USA
NAICS 561210
Source reference. 0db5662de5914b458655bed9898980cf
Submit through the official notice: https://sam.gov/opp/0db5662de5914b458655bed9898980cf/view
Funding Landscape's record of a notice published on SAM.gov.
Presolicitation Notice Presolicitation Notice Page 5 of 5 Presolicitation Notice *=Required Field Presolicitation Notice Page 1 of 5 The contractor will provide all material, labor, equipment, and supervision necessary to complete the above-named project at the VA Maryland Health Care System (VAMHCS), Building 1 Community Living Center (CLC) of the Loch Raven Campus.