Open·Ingested 10 days ago, not re-verified since. Deadlines can change; confirm on the official page.
Removal of the existing three span multi-beam bridge, replacement with a new single span PPC deck beam bridge supported by concrete abutments at each end on Steel H-piles, new bridge railing, aggregate
Illinois
View the solicitation
Free. Verify your email, then we send one reminder only.
- Posted
- Aug 15, 2026
- Closes
- Aug 27, 2026 (in 2 days)
Similar opportunities open now
- Multi-Use Path bridge deck replacement to include: TREATED TIMBER - 9035 FBM; TREATED DECK REMOVAL - 1 LSUM; HARDWARE - 3677 LBS; PROTECTIVE SHIELD - 237 SY; RAILROAD PROTECTIVE LIABILITY INSURANCE - 1Same funderOpenIllinoisCloses in 9 days
- APPROXIMATELY 62,853 SF OF PCC SIDEWALK INSTALLATION, SIDEWALK REMOVAL, TOPSOIL FURNISH & PLACE, SODDING, PARKWAY RESTORATION, CONCRETE CURB AND GUTTER, ADA CURB RAMPS, DRIVEWAY APRON REMOVAL AND REPLACEMENTSame funderOpenIllinoisCloses in 3 days
- Repair and Replace Walkways and PavementSame funderOpenIllinoisCloses in 7 days
- ISTHA RR 26-2049 Pavement Repair - PCCPSame funderOpenIllinoisCloses in 8 days
- Replace Flooring, Pool Deck and Wall FinishesSame funderOpenIllinoisCloses in 42 days
About this opportunity
Solicitation title: Removal of the existing three span multi-beam bridge, replacement with a new single span PPC deck beam bridge supported by concrete abutments at each end on Steel H-piles, new bridge railing, aggregate. Location: Illinois. Published: 2026-08-14. Closing date: 2026-08-27. BidNet Direct lists open solicitations from public agencies. Visit the detail page for scope, required documents, and submission instructions.