Skip to content
ClosedNo longer accepting applications

30--SUPPORT,CYLINDER, IN REPAIR/MODIFICATION OF

DEPT OF DEFENSE

About this archived opportunity

,Part Nomenclature, Part Number, NIIN, Type of Inspection, and Quantity of parts. b.N/A 2.The contractor shall perform Quality Conformance and Lot Sampling Inspection for all associated features that are present in the drawings and specifications: a.Features/attributes/requirements classified as Critical and Major on the drawing(s) or within the technical specification shall be inspected and shall have the actual dimensions documented 100%; b.Attributes for plating, hardness, and non-destructive testing shall be inspected 100%; c.Class 3 Threads, dimensions, and geometric feature controls with a tolerance range of .010 or less shall be inspected using an AQL of 1.5 and the General Inspection Level II as defined by ANSI Z1.4 d. Minor Characteristics: Sampling shall be inspected using an AQL of 4.0 and the General Inspection Level II as de-fined by ANSI Z1.4. 3.The material covered in this contract/purchase order will be used in a crucial shipboard system supporting the launch and/or recovery of aircraft. The use of incorrect or defective material would create a high probability of failure resulting in a serious personnel injury, loss of life, loss of vital shipboard systems, or loss of aircraft. Therefore, the material has been designated as Critical Safety Item (CSI) material and special control procedures are invoked to ensure receipt of correct material. 4.First Article Testing: N/A 5.Production Lot Special Tests: N/A 6.For purposes of this TDR, the term NDT shall refer to the following methods: MT - Magnetic Particle Testing, PT - Penetrant Inspection, UT - Ultrasonic Testing, RT - Radiographic Testing, and VT - Visual Testing. 7.Companies performing NDT shall be NADCAP accredited, or a laboratory accredited by one of the s listed below as satisfying ISO 17025 (General requirements for the competence of testing and calibration laboratories). NDT certificates shall be bear the symbols of accreditation and the accreditation body a. American Association for Laboratory Accreditation (A2LA) b. ANSI National Accreditation Board (ANAB) c. International Accreditation Service, Inc. (IAS) d. National Voluntary Laboratory Accreditation Program (NVLAP) e. Perry Johnson Laboratory Accreditation, Inc. (PJLA) f. Canadian Association for Laboratory Accreditation Inc. (CALA) g. Standards Council of Canada (SCC) 4. QUALITY ASSURANCE 4.1 . Mandatory Inspection Requirements: 100% Procurement Contracting Officer (PCO) mandatory inspection is required and shall be accomplished at source under the surveillance and final approval of the cognizant DCMAO Quality Assurance Representative (QAR). During production, mandatory inspection is required to be accomplished by the contractor as follows: A. Level of Inspection (LOI). 1. Critical characteristics: 100% inspection shall apply. 2. Major and Minor characteristics: LOI shall be in accordance with a sampling plan acceptable to the QAR. B. Critical characteristics: ;APPLIES; C. Major and Minor characteristics 1. Shall be defined by the contractor subject to QAR concurrence, unless defined on applicable drawings and associated specifications. 4.2 SPECIAL INSPECTION REQUIREMENTS ( ;APPLIES; ) MAGNETIC PARTICLE INSPECTION ( ;APPLIES; ) SURFACE INSPECTION ( ; ; ) PENETRANT INSPECTION ( ; ; ) RADIOGRAPHIC INSPECTION ( ; ; ) ULTRSONIC INSPECTION ( ; ; ) HIGH SHOCK TEST ( ; ; ) MECHANICAL VIBRATION TEST 4.3 FINAL INSPECTION REQUIREMENT:Due to the critical nature of this item, representatives of the buying office/and the cognizant field activity, NAWC Lakehurst, shall be notified by the successful contractor at least 14 days prior to presentation to the DCM QAR of the items for final inspection so that they may have the option of witnessing the final inspection. The contractor shall notify by email or TELEFAX PCO and NAWC Lakehurst QA ; ; to arrange for the final inspection.The authority of the QAR shall not be abrogated. If the notification is not given to both sites then the QAR shall not accept the units. 5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES - NOT APPLICABLE THIS IS AN ALRE CRITICAL SAFETY ITEM. FOR DRAWING UPDATES, SEE ATTACHED NAWC LKE DRAWING UPDATE SHEET. NAVSUP WSS REFERENCE ONLY: REPAIR TDR 25-10134 WAS UTILIZED IN SUPPORT OF THIS SOLICIATION/CONTRACT. THE COMPONENTS BEING ACQUIRED UNDER THIS SOLICITATION HAVE BEEN CLASSIFIED AS "CRITICAL" REQUIRING ENGINEERING SOURCE APPROVAL BY NAVAL AIR SYSTEMS COMMAND. ONLY THOSE COMPANIES WHO HAVE SUBMITTED AND BEEN APPROVED WILL BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION. ANY COMPANY MAY SUBMIT A SOURCE APPROVAL REQUEST AS OUTLINED IN THIS SOLICITATION. \ DATE OF FIRST SUBMISSION=ASREQ 12. DATE OF FIRST SUBMISSION Prior to commencing overhaul 16. REMARKS If the extent of the repair effort for this assembly is beyond the scope of the existing NAWCADLKE/NAVAIR approved overhaul/repair procedure for this assembly, then the overhauling contractor or activity shall provide a step-by-step overhaul procedure for disassembly and reassembly. NAWCADLKE engineering POC is kelly.a.caffarello.civ@us.navy.mil. The overhaul procedure shall be subject to NAVAIR approval prior to commencing overhaul. The procedure shall include SUGGESTED quality assurance "hold points" as required to ensure that any CSI/CAI components or processes that cannot be adequately inspected at final assembly are accessible for proper interim inspection. DATE OF FIRST SUBMISSION=ASREQ 12. DATE OF FIRST SUBMISSION Concurrently with Final Inspection 16. REMARKS Data Requirements a. Copies of all approved requests for variations. b. Paint removal per Note 15a of Drawing 3491AS0504. c. HVOF coating removal per Note 15b of Drawing 3491AS0504. d. Machining of base metal to accept new cladding per Note 15c of Drawing 3491AS0504. e. Magnetic particle inspection per Note 15d of Drawing 3491AS0504. f. Laser cladding per Note 15e of Drawing 3491AS0504. g. Finish machining per Note 15f of Drawing 3491AS0504. h. Identification per Note 15g of Drawing 3491AS0504.

Historical details

Status
Closed
Deadline
January 30, 2026
First captured
January 11, 2026
Publisher reference
761a907716dc4a3eac4f848a943ff5cc

This opportunity has closed

30--SUPPORT,CYLINDER, IN REPAIR/MODIFICATION OF

by DEPT OF DEFENSE

Get notified when similar opportunities open

We'll save this search and email you when new opportunities are posted. Free.

Refine this search