HOSE ASSY
DEPT OF DEFENSE
About this archived opportunity
the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.10.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.11 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.12 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected, identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer. 3.13 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.13.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.13.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.13.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.13.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.13.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.14 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.14.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.14.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.15 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.16 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.16.1 Visual examination upon receipt to detect damage during transit. 3.16.2 Inspection for completeness and proper type. 3.16.3 Verification of material quality received. 3.16.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.16.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.16.6 Identification and protection from improper use or disposition. 3.16.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.16.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.16.9 Material returned to the contractor must be handled as GFM. 3.17 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.17.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.18 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.18.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.18.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.19 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.19.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.19.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.19.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.20 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.20.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.21 See DI-MISC-80678 (SOC OFF-GASSING ANALYSIS) - Non-Metallic Material off-gassing test reports must, as a minimum, record the following data per NAVSEA SS800-AG-MAN-10/P9290, Appendix F: a. Testing facility name, address, and phone number. b. Date material tested. c. A positive statement that material composition was reviewed by NAVSEA to identify any additional target or non-target compounds prior to testing (See note below). d. Lot or batch number of material. e. Material chemical name or product name, model number, and serial number forend items/complete assemblies. f. Manufacturer of material. g. Sample weight. h. Sample surface area. i. Curing procedure - a description of pretest curing (include cure time and conditions) or burn-in operation (when applicable). j. Pressure and volume of test chamber. k. Temperature of test chamber. Indicate whether or not the electrical equipment/assembly was energized based on burn-in bench testing results. l. Total time specimen was in chamber before chemical analysis. m. Signature and date of test director. n. Test results: (1) List of constituents analyzed or identified. (2) Method of analysis used to analyze constituent (see Table F-5). (3) Allowable limit of each constituent (see Section F.6). (4) Reporting limit for each constituent (see paragraph F.5.4.c). (5) Absolute measured level of each constituent. (6) Normalized measured level of each constituent (ppm/L or ppm/g/L - see paragraph F.4.2.c) (7) Evidence of odor before and after the test (see paragraph F.4.4.1.b). (8) Curing/burn-in testing results, including cure time and cure conditions (e.g., temperature, pressure, cleaning, etc.). If burn-in bench testing of powered equipment was done prior to off-gas testing, annotate that along with test conditions. Note: The product name, including model and serial number, for end items may be used for complete equipment assemblies (also known as Commercial Off the Shelf (COTS) material) when the material chemical name is unknown. The testing activity must attempt to identify the non-metallic material of complete equipment assemblies and provide them when available. This option is not allowed for non-metallic material that is fabricated from raw non-metallic material that is fabricated from raw non-metallic material. The activity requesting laboratory off-gas testing must provide the Safety Data Sheet (SDS) to the appropriate Program Manager to ascertain whether additional target compounds or non-target compounds need to be looked for during the off-gas testing (See Section F.5.3.d). The non-metallic material off-gas test reports must be evaluated in accordance with Section F.6. All off-gas test reports will be retained and maintained in a manner suitable for audit. Non-metallic off-gas test reports that are used to qualify a specific material or are being used in lieu of the testing specified in Section F.5.5 must be submitted to the Program Manager for approval and will be maintained to support DSS certification. 3.22 See CDRL DI-MISC-80678 (Special Emphasis C of C) - The certificate of compliance must show traceability to the marking applied on each individual item, and must contain the following information: 1. Contractor's name, address, phone number and date. 2. The contract/purchase order number (i.e. N00104-11-P-FA12). 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Lubricants, sealants, anti-seize, and/or thread locking compounds. ("N/A" when Not Applicable). 5. Cure date ("N/A" when Not Applicable). 6. Manufacturer's compound number ("N/A" when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding performed on this Contract. ("N/A" when Not Applicable). 8. A statement for any Hull, Mechanical and Electrical (HM&E) testing required that include the name of the test and that it was performed satisfactorily. If no HM&E testing is required, the statement should read "Hull, Mechanical and Electrical (HM&E) testing N/A." 9. A statement to the effect that all items furnished on this contract are in full compliance with the specifications and requirements. 10. Contractor's or authorized personnel's signature. 3.22.1 For Connectors, Cables, and Junction Boxes procured to EB Specs S-5343934-1, S-5343934-2, S-5343934-3, or Dry Deck Shelter Specification S-5486639-1, the Certificate Of Compliance must also include the information below: 11. A notation that 32 root mean square (RMS) finishes are in accordance with the specifications and are free of imperfections. 12. Direct reading of O-ring surface diameters with specified standard. 3.22.2 For Self-Locking Hex Nuts procured to NASM 25027, the Certificate Of Compliance must also include the information below: 13. A statement to the effect that qualification testing in accordance with NASM 25027 Paragraph 3.2 is satisfactorily performed. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for propriet...
Historical details
- Status
- Closed
- Deadline
- January 30, 2026
- First captured
- January 11, 2026
- Publisher reference
- c2dd48cd10de41889e167b56cf98546a
This opportunity has closed
HOSE ASSY
by DEPT OF DEFENSE
Get notified when similar opportunities open
We'll save this search and email you when new opportunities are posted. Free.