Monroe Harbor Advanced Maintenance Dredging
DEPT OF DEFENSE
About this archived opportunity
Monroe Harbor Advanced Maintenance Dredging - The project requirements include: Mobilize dredge to Monroe Harbor. Monroe Harbor will be mechanically dredged due to the character of materials (boulders, rocks, and more clay-like material) within the harbor. Dredged material placement method is unrestricted. The harbor will be dredged to a depth of 23-ft below Low Water Datum (LWD) plus 1-ft overdepth or point of refusal, whichever is less, within the main channel for STA 60+00 to 76+00, 0+00 to 20+00 river and 0+00 to 20+00 lake. From STA 15+75 to 4+00, a section near the wall will be dredged to 20 ft below LWD plus 1-ft overdepth or point of refusal, whichever is less. The turning basin will be dredged to a depth of 20-ft below LWD plus 1-ft overdepth or point of refusal, whichever is less, for STA 64+72 to 79+00. Placement of dredged material will be in Cell 3 at Pointe Mouillee Confined Disposal Facility (CDF). No discharge is allowed at Pointe Mouillee CDF. Demobilize when dredge work is complete.
Historical details
- Status
- Closed
- Deadline
- January 21, 2026
- First captured
- January 11, 2026
- Publisher reference
- 1b2329e892544f6e891ef0a07306d942
Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA
This opportunity has closed
Monroe Harbor Advanced Maintenance Dredging
by DEPT OF DEFENSE
Get notified when similar opportunities open
We'll save this search and email you when new monroe, harbor, advanced opportunities are posted. Free.