ZDV CTRB Raised Floor
TRANSPORTATION, DEPARTMENT OF
About this archived opportunity
The overall scope of this project is to provide a new 18� high raised access floor system (+/- 2,982 SF) and SRG in the Control Wing Basement at ZDV. (2) new ADA compliant ramps and stairs will be provided to access the new raised access floor. A new 9�-6� partition will be constructed to enclose the new raised access floor system. The existing nonconforming east door will be removed, and a new door will be provided within a new 2-hour rated alcove. The contractor shall provide all necessary labor, materials, and equipment to complete the following work. Also review the attached drawings and specifications.
Historical details
- Status
- Closed
- Deadline
- January 28, 2026
- First captured
- January 11, 2026
- Publisher reference
- 3ae3226d722b46ed9c7778e4f935cc05
Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA
This opportunity has closed
ZDV CTRB Raised Floor
by TRANSPORTATION, DEPARTMENT OF
Get notified when similar opportunities open
We'll save this search and email you when new raised, floor opportunities are posted. Free.