FY26 anticipated levee work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Districts
DEPT OF DEFENSE
Free. Verify your email, then we send one reminder only.
- Posted
- Jan 11, 2026
- Closes
- Sep 30, 2026 (in 31 days)
Similar opportunities open now
- FY26 anticipated stone work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) DistrictsSame funderOpenDEPT OF DEFENSECloses in 31 days
- Mississippi River, New Orleans Harbor and Various Bar Channels Cutterhead Dredge No. 5-2025Same funderOpenDEPT OF DEFENSECloses Jun 2027
- Mississippi River Outlets, Vicinity of Venice, Louisiana Tiger Pass Bar Channel, Maintenance Dredging, Plaquemines Parish, LA (ED 24-011)Same funderOpenDEPT OF DEFENSECloses Jul 2027
- Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)Same funderOpenDEPT OF DEFENSECloses Feb 2027
At a glance
This is a government contract opportunity posted by DEPT OF DEFENSE in the other heavy and civil engineering construction category. The deadline is September 30, 2026, 31 days from now.
Classification and identifiers
- Industry (NAICS)
- Other Heavy and Civil Engineering Construction (23799)
- Product or service (PSC)
- Construction of Other Non-Building Facilities (Y1PZ)
- Solicitation number
- W912MVD260002
- Contracting office
- W07V ENDIST VICKSBURG
Who can apply
About this opportunity
The intent of this special notice is to share the most current information available with respect to anticipated levee work requirements within the Mississippi Valley Division (MVD) in the Memphis (W912EQ), Vicksburg (W912EE), and New Orleans (W912P8) Districts during Fiscal Year 2026. NOTE: This information includes projected requirements and schedules that are subject to change. All project information is subject to change as designs are refined and impacts are quantified. Principle features of work include construction of various types of earthen levee embankment enlargement and repair, seepage berm construction, seepage cut-off construction, and/or installation of relief wells. This work will be performed primarily along the Mississippi River levee system within the geographic bounds w...