WA ERFO FS MTBKR605 2022-1(3), Mt. Baker � Forest Road 11 MP 23.9 Repair
TRANSPORTATION, DEPARTMENT OF
Place of performance: Concrete, WA
At a glance
This is a government contract opportunity posted by TRANSPORTATION, DEPARTMENT OF in the highway, street, and bridge construction category. The estimated value is $700,000 - $2,000,000. Work is performed in Concrete, WA.
Classification and identifiers
- Industry (NAICS)
- Highway, Street, and Bridge Construction (237310)
- Product or service (PSC)
- Construction of Highways, Roads, Streets, Bridges, and Railways (Y1LB)
- Solicitation number
- 69056726B000002
- Contracting office
- 690567 WESTERN FEDERAL LANDS DIV
Amount
$700,000 - $2,000,000
About this opportunity
WA ERFO FS MTBKR605 2022-1(3), Mt. Baker � Forest Road 11 MP 23.9 Repair This Work consists of emergency repair of a roadway failure including subexcavation, aggregate surfacing, and root-wad/riprap embankment. Project Location: Approximately 22 Miles NE of Concrete city, Whatcom County, Washington State. Project Length: 0.038 Miles Estimated Price Range: Between: Between $700,000 and $2,000,000 Tentative Solicitation Date: Winter/Spring 2025 Tentative Fixed Completion Date: Fall 2026 See attachments for additional information
Related opportunities
- WA ERFO FS MTBKR605 2022-1(3), Mt. Baker - Forest Road 11 MP 23.9 RepairTRANSPORTATION, DEPARTMENT OF
- WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107TRANSPORTATION, DEPARTMENT OF
- WA ERFO FS OLYMP609 2022-1(1), Olympic FS ERFO Repairs 2022TRANSPORTATION, DEPARTMENT OF
- WA NP OLYM 115(1) , Repair Storm Damage on Mora RoadTRANSPORTATION, DEPARTMENT OF
- WA FLAP SKAMAN 92135(1), Wind River Road Slide ReconstructionTRANSPORTATION, DEPARTMENT OF
- OR WA NP MULTI PMS(1), Pavement Preservation Oregon and Southern WashingtonTRANSPORTATION, DEPARTMENT OF