Skip to content
ClosedNo longer accepting applications

66--NAVIGATIONZLGHTZWHI

DEPT OF DEFENSE

About this archived opportunity

the way a retrofit should be accomplished. g. Impacts to any logistics support elements (such as software, manuals, spares, tools, and similar) being utilized by Government personnel in support of the product. h. Impacts to the operational use of the product. i. Complete estimated life-cycle cost impact of the proposed change. j. Milestones relating to the processing and implementation of the engineering change. 3.6.4 A copy of the final waiver/deviation (both approved and disapproved) must be forwarded with the applicable asset(s). 3.7 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document, including any/all invoked specifications and drawings. ^ QUALITY ASSURANCE REQUIREMENTS ^ 3.8 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012 or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate. 3.8.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/nonacceptance by the Government representative to determine the system's effectiveness in meeting the quality requirements established in the Contract/Purchase Order. 3.8.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon notification, make his facilities available for audit by the contracting Officer or his authorized representative. 3.8.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Deep Submergence Systems Program (DSSP) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at NAVICP-Mech may request the PCO waive this requirement. 3.8.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately. 3.8.5 Any changes made by the Contractor to a qualified quality system will require concurrence by the Government Quality Assurance Representative prior to adoption. 3.9 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and rejected and the nature of corrective action taken as appropriate. 3.9.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made available for operations of such devices and for verification of their accuracy and condition. 3.9.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided by the Government representative. 3.10 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured/performed within the contractor's facility. Such inspection can only be requested by or under authorization of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative DCMA Office cannot be located, our purchasing agent should be notified immediately." 3.11 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following: 3.11.1 Visual examination upon receipt to detect damage during transit. 3.11.2 Inspection for completeness and proper type. 3.11.3 Verification of material quality received. 3.11.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage. 3.11.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation. 3.11.6 Identification and protection from improper use or disposition. 3.11.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and necessity for withholding the material from use. 3.11.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on bailed property must be maintained. 3.11.9 Material returned to the contractor must be handled as GFM. 3.12 Traceability and Certification Requirements - To assure that correct materials are installed in DSSP systems, it is imperative that traceability be maintained from the material to all required Objective Quality Evidence (OQE). 3.12.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified elsewhere in the contract/purchase order. 3.13 Material Traceability - Traceability markings must be permanently applied to the material in accordance with MIL-STD-792 or to a tag affixed to the material, and annotated on the required OQE. The traceability marking may be any vendor traceability number/code which provides complete traceability to the required OQE. Traceability Marking/Identification may include such items as Nomenclature, Part Number, Technical Description, National Stock Number (NSN), etc. Traceability must be maintained through all process operations including any subcontracted operations, to the finished component. 3.13.1 When traceability markings on the material would be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of material or loss of traceability. The traceability marking must be reapplied upon completion of the final manufacturing process. 3.13.2 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings on the material, purchase or work orders must specify a method and marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing. 3.14 Final Inspection - The following inspections must be performed prior to Government inspection and acceptance. 3.14.1 Material Sampling - Material must be inspected for form, fit, and function. Lot acceptance must be based on zero defects and lot rejection based on one defect. The sample size must be in accordance with the sampling plan(s) in the applicable military specification or standard, federal specification or standard, or drawing to which the material was manufactured. In the absence of such sampling plans, sampling inspection must be per ANSI/ASQ-Z1.4, general inspection level II (for sample size selection code), table IIA (for sample size). SMALL LOT SIZES - For lot sizes of fifty or less, the minimum sample size must be eight units. For lot sizes of eight or less, the sample size must be one hundred percent of the lot. 3.14.2 The Manufacturer may elect to use Statistical Process Control (SPC) to assure product quality in lieu of the above attribute sampling plan, provided that the SPC methodology/system used provides acceptable products to the Government. However, the Government Inspection Activity may perform their acceptance inspection of the material using the attribute sampling plan outlined above. 3.14.3 All OQE required by the Contract and all data concerning material traceability (OQE to traceability marking) must be 100% inspected. The certification test reports must also be 100% inspected for completeness and legibility. 3.15 Test Certification - When test certifications are required elsewhere in the contract, certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable. 3.15.1 If material is received without the required test certification papers or with incorrect/missing data on the certification papers, the material will be rejected. 3.16 See CDRL DI-MISC-80678 (SOC CRITICAL VOLUME TESTING) - The Critical Volume Test Record (Implodable/Explodable), as a minimum, must include the following information: a. Name(s), model number(s), and serial number(s) of component(s) tested. b. Date of test. c. Serial number(s) of gage(s) used for the test. d. Last calibration date of the pressure gage(s) used in the test. e. Next calibration due date of the pressure gage(s) used in the test. f. Test medium temperature required and actual test medium temperature used. g. Pressure range and accuracy of gage(s) used. h. Test pressure for each pressure cycle. i. Required and actual duration of each pressure cycle. j. Results of the test (i.e., SAT or UNSAT) per the above criteria. k. Printed name(s) and signature(s), or Identification Number(s) and signature(s) of test conductor(s)/inspector(s), and the date of each signature. 3.17 See CDRL DI-MISC-80678 (Special Emphasis C of C) The certificate of c compliance must show traceability to the marking applied on each individual item and must contain the following information. 1. Contractors name, address, phone number and date. 2. The NAVSUP contract/purchase order number (i.e. N00104-11-P-FA12) 3. The national stock number (NSN). The 18 character National Stock Number for Special Emphasis Material includes the two digit COG, the four digit FSC, the 9 digit NIIN, and the two digit SMIC (i.e. 1H 4820 012345678 D4) ("N/A" when Not Applicable). 4. Lubricants sealants, anti-seize, and/or thread locking compounds. (N/A wh when Not Applicable).5. Cure date (N/A when Not Applicable). 5. Cure date (N/A when Not Applicable). 6. Manufacturers compound number (N/A when Not Applicable). 7. When weld procedure submittal is required by the contract, a statement that the approval date of the qualification data precedes any production or repair welding preformed on this Contract. (N/A when Not Applicable). 8. When pressure testing is required (e.g. hydrostatic, external tightness, seat tightness), the following information must be included on the C of C for each pressure test preformed: a. Name and serial number(s) of component(s) tested. b. Date of test. When multiple components are being tested, the date of the testing recorded on the C of C should be the date when the final component was tested for the lot. c. The required test pressure with tolerances, required number of cycles and required test duration and record the actual test pressures, actual cycles and actual durations accomplished during testing (e.g. Cycle 1 - 3 X 100 +/-5 psig for 5 minutes). d. The required test medium and required allowable leakage (when applicable) and record the actual test medium used and actual leakage experienced during testing (as applicable). e. A Test Acceptance Signature by Contractor's authorized individual must sign at the completion of all testing attesting that the person(s) who actually preformed or witnessed the tests verified that all associated test perameters were met, indicate acceptance of all recorded test data and certifying the satisfactory completion of the required test(s). NOTE: the contractors internal actual test records must list each component o or lot of components tested together identified by component serial number(s) and must note acceptability by the initials or identification number of the person reforming or witnessing the test and the date the test was performed. These test records must be maintained by the contractor for a minimum of seven years or as noted by the contract or contractually invoked documents. 9. A statement that any additional Hull, Mechanical and Electrical (HM&E) testing required, identified by name of test and that it was performed satisfactorily. If no additional HM&E testing is required, the statement should read "Hull, Mechanical and Electrical (HM&E) testing N/A.". 10. A statement to the effect that all items furnished on this contract are in full compliance with this procurement document including any invoked specification and drawings. 11. Contractors authorized personnels printed name, signature and date. 4. QUALITY ASSURANCE 4.1 Notes to DCMA QAR and the Contractor - 4.1.1 DCMA QAR and the Contractor for proprietary designs - Departures from Contractor imposed requirements, not specifically covered by the contract, must be judged individually on the basis of the effect, if any, on contractual requirements. When there is a disagreement between the Contractor and the Government representative as to the effect on contractual requirements, the departure must be considered a nonconformance and be submitted to the PCO for disposition. 4.1.2 DCMA QAR and the Contractor for proprietary designs - All records of departures from Contractor imposed requirements must be maintained and available for review at the Contractor's facility. A copy must be given to the local Government representative. A record of these departures, traceable to the applicablepart number and contract number must be submitted to the PCO. 4.1.3 DCMA QAR and the Contractor for proprietary designs - For proprietary designs, the contractor's part numbers are acceptable for reference only. The delivered material must conform to all drawings, specifications, and other contractual requirements. 4.1.4 DCMA QAR - It is the responsibility of DCMA QAR to review Non-Destructive Testing (NDT) procedures for NAVSUP Contracts/Purchase Orders. 4.1.5 DCMA QAR and the Contractor - The ECDS (Electronic Contractor Data Submission) system is available for certain data submissions and to submit questions and clarifications, and waiver requests on Contracts and Solicitations. ECDS can be found at: https://register.nslc.navy.mil/ 5. PACKAGING 5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking must be in accordance with the Contract/Purchase Order Schedule and as specified below. MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE 6. NOTES 6.1 Several definitions of terms that apply to CSI items are listed below. All terms may not apply to every item. 6.1.1 The ECDS (Electronic Contractor Data Submission) system is at: https://register.nslc.navy.mil/ This application will require advance registration using a PKI Digital Certificate on a CAC. A Vendor User Guide is available as CSD001 in the CSD (Contract Support Document) Library within ECDS. 6.1.2 Critical Safety Item (CSI) - Any ship part, assembly, or support equipment containing a critical characteristic whose failure, malfunction, or absence of which could cause a catastrophic or critical failure resulting in loss of, or serious damage to the ship, or unacceptable risk of personal injury or loss of life. 6.1.3 Critical Process - As determined by the TWH, any process, operation or action performed on a Ship CSI that serves to establish a critical characteristic (such as welding, soldering, machining, polishing, cleaning, or assembling) or confirm that a critical characteristic is within drawing or specification compliance (such as, testing, measurement, or non-destructive evaluation). 6.1.4 First Article - Pre-production models, initial product samples, test samples produced to ensure a manufacturer's capability to meet full specification requirements. 6.1.5 First Article Test (FAT) - Contractually required testing and inspection of a supplier's pre-production, production, or "production representative" specimens to evaluate a manufacturer's ability to produce conforming product prior to the Government's commitment to receive subsequent production items. First Article Testing is product specific and does not assess manufacturing process controls nor does it assure the effectiveness of the manufacturer's quality program. 6.1.6 Government Source Inspection (GSI) - GSI is independent oversight performed by a government representative usually a DCMA Quality Assurance Representative (QAR)) to assure that those unique product quality and system elements, identified by the Contracting Agency as important, are observed and evaluated. 6.1.7 Quality Assurance Letter of Instruction (QALI) - A QALI is a formal document initiated by a contracting activity that provides essential requirements and instructions for contracted materials to be independently verified and accepted by a government representative prior to shipment. 6.1.8 Objective Quality Evidence (OQE) - The quantitative and qualitative data of all mechanical, chemical, and performance tests performed (as required by the applicable specification, drawing, or purchase document) to prove that the material supplied conforms to the specified requirements. 6.1.9 Surface Discontinuity - Any surface irregularity, marking, or localized change in physical character of the surface, other than dimensional, that exists infrequently at one or several places. (Examples: burrs, dents, nicks, ...

Historical details

Status
Closed
Deadline
March 16, 2026
First captured
January 11, 2026
Publisher reference
f7babcce137a4318b99dee67c2baddf0

This opportunity has closed

66--NAVIGATIONZLGHTZWHI

by DEPT OF DEFENSE

Get notified when similar opportunities open

We'll save this search and email you when new opportunities are posted. Free.

Refine this search