Water Well Drilling Project at California Hotel
STATE, DEPARTMENT OF
About this archived opportunity
The US Embassy in Bujumbura, Burundi, has requirements for drilling a new well to include purchasing and installing the well pump and connecting the well to the bulk water supply fill station that will be located at Embassy 02 Compound outside perimeter wall. The objective is to have a fully functioning water well that will supply water to the rest of Embassy residential areas using water distribution truck, the truck must be able to connect easily to bulk supply filling station. In accordance with the terms and conditions set forth below, the Contractor will furnish all supervision, labor, management, facilities, supplies, equipment and material, and all required services necessary for the performance of the work. The Contractor will provide the required services to the U.S. Government as described in the requirements of the Statement Of work.
Historical details
- Status
- Closed
- Deadline
- March 11, 2026
- First captured
- January 30, 2026
- Publisher reference
- 791cacb6a6134c3a9319c5a1605f42be
Eligibility: No Set aside used. NONE
This opportunity has closed
Water Well Drilling Project at California Hotel
by STATE, DEPARTMENT OF
Get notified when similar opportunities open
We'll save this search and email you when new water, well, drilling opportunities are posted. Free.