Skip to content
OpenDue March 9, 2026

UPS battery backup

AGRICULTURE, DEPARTMENT OF

Who can apply

Total Small Business Set-Aside (FAR 19.5). SBA

About this opportunity

Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. Solicitation and attachment are posted below.

Finding similar opportunities...