Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY).
DEPT OF DEFENSE
About this opportunity
Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY) The work consists of furnishing all labor, materials, tools, and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY, and incidental related work. The project is divided into a base project and six (6) options. The work involves: Removal of the existing steel ramp that extends from the yard to the floating docks; Demolition and removal of existing ramp abutment; Removal of existing timber piles, steel pipe piles, and concrete piles; Demolition and removal of concrete piles and pile caps from existing railroad trestle; Excavation, dredging and disposal of materials; Installation of steel floats (GFE); Installation of a new landing barge; Providing new steel pipe piles and steel-fr...