OpenDue March 9, 2026
UPS battery backup
AGRICULTURE, DEPARTMENT OF
Who can apply
Total Small Business Set-Aside (FAR 19.5). SBA
About this opportunity
Work includes adding a UPS system to a server. Installation includes a 25kW UPS unit on one of the current 60-amp circuits for the main server rack. Equipment includes a Galaxy VS UPS 25kW 208V, 2 internal 9Ah smart modular battery strings, expandable to 4, Start-up 5x8, or equal, and Galaxy VS Maintenance Bypass cabinet, UL, Single-unit 10-40kW 208V, 20-80kW 480V, or equal. Also required is an Emergency Power Off button. Solicitation and attachment are posted below. Photos of room and equipment posted below.
Finding similar opportunities...