Skip to content
OpenDue February 27, 2026

Relocation and Calibration of Mobile Space Saver Racking System

DEPT OF DEFENSE

Who can apply

Total Small Business Set-Aside (FAR 19.5). SBA

About this opportunity

All interested vendors should submit a capabilities statement via email to the Contracting Specialist SrA Janiya Brown at [email protected] and SSgt [email protected] 1.0 Vision Statement The contractor shall provide all labor, tools, and equipment necessary to disassemble, transport, and reassemble one (1) high-density mobile storage system. 2.0 Scope of Work The system footprint is approximately 19� x 19� x 8.5�, consisting of four (4) rows of shelving integrated with Vidmar-style drawers, mounted on a three-rail sliding track system. ? Disassembly (Bldg 301D): Contractor shall inventory all components, safely remove Vidmar drawers, and disassemble the shelving units and the three-rail track system. ? Transportation: Secure transport of all components from Bldg 301D to Bldg 50...

Finding similar opportunities...