Skip to content
OpenDue March 12, 2026

Trapper Creek Dorm Asbestos and Mold Remediation and Reconstruction

AGRICULTURE, DEPARTMENT OF

Who can apply

Total Small Business Set-Aside (FAR 19.5). SBA

About this opportunity

The Trapper Creek Job Corps Center has identified the need for asbestos remediation in mechanical and storage rooms in dormitory buildings 10, 11, 12, 13 after a site inspection finding of asbestos tile underneath the current carpet tiles. After remediation, new resilient vinyl sheet flooring is to be installed. To fully access the floor, the existing water heaters and furnace units will have to be uninstalled prior to removal and reinstalled after the new flooring has been laid. The need for mold remediation has also been identified in building 11 (dorm 2). The plumbing leaks that caused the mold issue have already been addressed and the wall opened up, but remediation in the wall, on the floor, and in the crawlspace is still required. After remediation new gypsum board also needs to be i...

Finding similar opportunities...