Skip to content
ClosedNo longer accepting applications

Sources Sought Notice for High-Speed Fiber-Optic Wi-Fi

DEPT OF DEFENSE

About this archived opportunity

Sources Sought Notice: Managed Wi-Fi Solution Reference Number: FA2543FitnessCenterWi-Fi Agency: Department of the Air Force, Buckley Space Force Base, Colorado Disclaimer: This is a Sources Sought Notice for market research purposes only and does not constitute a solicitation for proposals or a commitment to award a contract. The Government will not reimburse any costs associated with providing a response to this notice. 1. Introduction The 460th Force Support Squadron at Buckley Space Force Base (SFB), located in the Denver-metro area, is seeking sources capable of providing a turnkey, managed high-speed Wi-Fi solution for the base fitness center. The facility is approximately 80,000 sq. ft., constructed with a steel frame and concrete floors. The desired solution must support a high-density environment of over 1,500 simultaneous users. 2. Summary of Requirements The Government requires a comprehensive solution that includes a 1 Gbps fiber optic internet circuit and all associated hardware, installation, and ongoing support. Category Key Requirement Internet Service 1 Gbps symmetrical (1000 Mbps download/upload) dedicated fiber optic circuit. Core Hardware Enterprise-grade firewall, 24-Port Managed PoE Switch, and high-density Wi-Fi 6/6E Access Points. Service Model Monthly subscription basis, including all hardware, licensing, and support to eliminate upfront capital costs. Support & Warranty 24/7/365 proactive network monitoring and a "no-fault" warranty covering repair or replacement of all hardware. Project Completion The system must be fully installed, tested, and operational no later than March 29, 2026. 3. Scope of Work & Services The contractor shall provide all necessary hardware, software, engineering, and installation services for a complete 1 Gbps Managed Wi-Fi System. Core Service Features (Monthly Subscription): Turnkey Solution: Provide, manage, and maintain all components required for the service. Professional Installation: Includes a predictive site survey, network design to ensure optimal coverage, and professional installation of all cabling and hardware. Hardware Provision: All necessary equipment, including a firewall/controller, 24-port PoE+ switch, and Wi-Fi Access Points, provided on a subscription basis. Total Warranty & Replacement: All equipment is fully covered against failure, damage, or obsolescence for the duration of the contract term. License Management: Contractor is responsible for managing all required software and service licenses. Installation Tasks: The contractor shall perform all tasks required for a successful installation, including but not limited to: General site and Wi-Fi predictive surveys. Determination of network demarcation point. Placement and installation of router, switches, and Wi-Fi Access Points. Installation of all interconnecting wiring. Verification of adequate power sources. Final system turn-up, testing, and user training. General Requirements: The contractor is responsible for providing all tools and equipment necessary for installation (e.g., scissor lifts, ladders, cabling tools). 4. Response Submission Instructions Interested parties are requested to submit a capability statement in response to this notice. Submissions should be sent via email to travis.fritts.1@spaceforce.mil, with the subject line "Response to: FA2543FitnessCenterWi-Fi". Response Due Date: No later than 4:00 PM MST on February 25, 2026. Your capability statement should include: Company Information: Company name, address, point of contact, phone number, email address, CAGE code, and UEI number. Business Size: Please indicate your business size status (e.g., Small Business, 8(a), HUBZone, SDVOSB, etc.). Statement of Capability: A brief description of your company's ability to meet the requirements outlined in this notice. Please confirm your ability to meet the delivery deadline of March 29, 2026. Past Performance: A brief description of similar projects your company has completed for government or commercial clients.

Historical details

Status
Closed
Deadline
February 27, 2026
First captured
February 19, 2026
Publisher reference
87ad7606b17248e9a19b03867048847c

Eligibility: No Set aside used. NONE

This opportunity has closed

Sources Sought Notice for High-Speed Fiber-Optic Wi-Fi

by DEPT OF DEFENSE

Get notified when similar opportunities open

We'll save this search and email you when new sources, sought, high opportunities are posted. Free.

Refine this search