Skip to content
ClosedNo longer accepting applications

Lexington Harbor Breakwater Repair

DEPT OF DEFENSE

About this archived opportunity

***Amendment 0002 is issued to extend the bid due date, extend the bid opening date, incorporate Davis-Bacon Act Wage Determination MI20260049, extend the Request for Information period, revise drawing and specification sheets, provide images of the work site without snow cover, provide the site visit attendee list. Reference the amendment document for full details. ***Amendment 0001 is issued to remove FAR Clause 52.236-27 - Site Visit (Construction) and to provide organized site visit information within Section 00 21 13 - Instructions to Bidders. Reference the amendment for full details.*** Lexington Harbor Breakwater Repair. This project includes breakwater repair operations at Lexington Harbor. The north breakwater is a permeable rubble mound structure and allows sand shoaling within the harbor. Voids in the north breakwater are exacerbating sediment infiltration within the harbor. A walkway is present atop the north breakwater. The walkway is approximately 5 feet wide and generally in good condition. The north breakwater voids are partially sand filled. The sand fill depth varies; however, sand generally extends to the existing water elevation. The project objective is to alter the existing permeable rubble mound breakwater structure to an impermeable structure. The proposed scope of work includes constructing a grout curtain wall within the structure. The proposed grout curtain wall is chemical grout and a cementitious grout material. The chemical grout material is proposed within the sand filled breakwater structure. The cementitious grout material is proposed above the sand filled area. The intent of the grout curtain wall is to prevent sand from infiltrating through the breakwater structure. The existing Portland cement concrete walkway is reconstructed upon completion of grouting operations. As previously stated, the project includes breakwater repair by constructing a grout curtain wall and Portland cement concrete walkway reconstruction. Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Strategic-Partnerships/Partnering/mod/129895/details/443/ then scrolling down on right hand side of page by clicking on ?View FFP Contract Changes Playbook Here?.

Historical details

Status
Closed
Deadline
March 5, 2026
First captured
February 21, 2026
Publisher reference
eaa28c598a3e47af81e0c724e20ca9ad

Eligibility: Total Small Business Set-Aside (FAR 19.5). SBA

This opportunity has closed

Lexington Harbor Breakwater Repair

by DEPT OF DEFENSE

Get notified when similar opportunities open

We'll save this search and email you when new lexington, harbor, breakwater opportunities are posted. Free.

Refine this search