WA NP MORA 11(1), Fryingpan Creek Bridge
TRANSPORTATION, DEPARTMENT OF
Place of performance: WA
Free. Verify your email, then we send one reminder only.
- Posted
- Feb 24, 2026
- Closes
- Rolling, no fixed deadline
Similar opportunities open now
- WA FWS LPO MULTI(1) Little Pend Oreille NWR Culvert ImprovementsSame funderOpenTRANSPORTATION, DEPARTMENT OFNo deadline listed
- WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road ResurfacingSame funderOpenTRANSPORTATION, DEPARTMENT OFNo deadline listed
- WY NP YELL 15(2), Madison River BridgeSame funderOpenTRANSPORTATION, DEPARTMENT OFNo deadline listed
- WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107Same funderOpenTRANSPORTATION, DEPARTMENT OFNo deadline listed
- OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton TrailheadSame funderOpenTRANSPORTATION, DEPARTMENT OFNo deadline listed
At a glance
This is a government contract opportunity posted by TRANSPORTATION, DEPARTMENT OF in the highway, street, and bridge construction category. Applications are accepted on a rolling basis. Work is performed in WA.
Classification and identifiers
- Industry (NAICS)
- Highway, Street, and Bridge Construction (237310)
- Product or service (PSC)
- Construction of Highways, Roads, Streets, Bridges, and Railways (Y1LB)
- Solicitation number
- 69056726B000001
- Contracting office
- 690567 WESTERN FEDERAL LANDS DIV
Who can apply
About this opportunity
Update 2/23/2026: QA_2-20-2026.pdf posted to attachments. PROJECT: WA NP MORA 11(1), Fryingpan Creek Bridge The work consists of bridge replacement, roadway realignment, parking lot, minor pipe culvert replacement, stone masonry Bridge Information: The project includes construction of a single span, 218.5-foot long steel plate girder bridge with cast-in-place concrete deck. Abutments are founded on deep foundation (drilled shafts). The work includes demolition of the existing steel arch girder bridge upon completion of the new structure. Project Length: 0.27 miles Tentative Fixed Completion Date: Summer 2029 (Once solicitation is issued, see SF-1442 continuation, Block 11 for exact date.) Tentative Solicitation Date: Winter 2026 Estimated Price Range: $10 million to $20 million Location: 3...