J045--PMI Boiler Inspection -w/wd, Base+4, POP 3/30/2026 - 3/29/2031
VETERANS AFFAIRS, DEPARTMENT OF
About this archived opportunity
Questions for 36C26226Q0326_1 PMI Boiler Inspection Services Please provide installation date for each boiler to assist with preparation of required inspection/maintenance schedule? Installation dates are TBD. April/September For High and Low Pressure Boilers. Refer to SOW for details of each. Pricing schedule - CLN 0006 - is this intended to price a backup boiler if required per page 45 (6.3 requirement)? Yes, if there need to be work on a boiler that it needs to be shut down more than 72hrs for repair. Is it anticipated that Welding work will be required, noting the technical requirements for a welder certification in the solicitation- They will need to have welding Certification to weld on parts if needed.� 2-4 hours response time - is that by telephone or on-site response?� On Site response PMI Boiler Inspection Services
Historical details
- Status
- Closed
- Deadline
- March 6, 2026
- First captured
- February 24, 2026
- Publisher reference
- 87f91e681e8242f89d374e735b7f5848
This opportunity has closed
J045--PMI Boiler Inspection -w/wd, Base+4, POP 3/30/2026 - 3/29/2031
by VETERANS AFFAIRS, DEPARTMENT OF
Get notified when similar opportunities open
We'll save this search and email you when new boiler, inspection, base opportunities are posted. Free.