John Day Dam Turbine Replacement and Generator Rewind (TRGR)
DEPT OF DEFENSE
Who can apply
No Set aside used. NONE
About this opportunity
02/24/2026: Amendment 1 remains forthcoming and is expected to be published in the coming week. This amendment will formally extend the phase 1 proposal due date to Friday, 04/03/2026, as well as provide some revisions to technical information. Phase 1 proposal instructions and evaluation criteria remain unchanged through amendment 1. Additionally, this project was solicited before the 02/01/2026 effective date for the Department of War's adoption of the Revolutionary FAR Overhaul (RFO), therefore, no revisions to the solicitation to adopt the RFO are required, or planned. 01/09/2026: The Phase 1 solicitation package, which includes the phase 1 solicitation with specifications, solicitation drawings, reference drawings, bid schedule, and brand name justification, is attached. Amendment 1 i...